英特尔近日发布了一条“坏消息”,宣布其7nm芯片的计划相对于先前的预期大约偏移了六个月。现在的趋势比该公司的内部目标低了约十二个月。此前,苹果宣布计划在未来的电脑中依靠自己的CPU,而AMD和NVIDIA等竞争对手已经利用7nm技术制造出更高效的处理器。这一延迟或为竞争对手AMD等在未来几年内在PC处理器市场中占据主导地位打开了大门。
Intel (PDF):
Intel is accelerating its transition to 10nm products this year with increasing volumes and strong demand for an expanding line up. This includes a growing portfolio of 10nm-based Intel Core processors with “Tiger Lake” launching soon, and the first 10nm-based server CPU “Ice Lake,” which remains planned for the end of this year.
In the second half of 2021, Intel expects to deliver a new line of client CPU’s (code-named “Alder Lake”), which will include its first 10nm-based desktop CPU, and a new 10nm-based server CPU (code-named “Sapphire Rapids”). The company's 7nm-based CPU product timing is shifting approximately six months relative to prior expectations. The primary driver is the yield of Intel's 7nm process, which based on recent data, is now trending approximately twelve months behind the company's internal target.
随着产量的增加和对扩大生产线的强烈需求,英特尔今年正加速向10nm产品的过渡。该公司制定了应急计划以保持竞争力,以弥补7nm延迟。更多的10nm芯片将通过“ Tiger Lake ”英特尔酷睿处理器到货,该处理器有望于9月推出,并为即将推出的几款笔记本电脑供电。
该公司还计划在2021年下半年宣布一个名为“ Alder Lake”的新10nm处理器系列,其中还将包括一款新的基于10nm的服务器CPU(代号为“Sapphire Rapids”)。根据最近的数据显示,目前的趋势是落后于公司内部目标约12个月。
Tom's Hardware指出,在发布后的一次电话中,包括首席执行官Bob Swan在内的高管们表示,该公司在7纳米工艺中确定了一种“缺陷模式”,从而导致“成品率下降”。他说:“我们现在预计将在2022年末或2023年初看到我们的第一款基于Intel的7nm产品(桌面端CPU)的首次量产出货。”很明显,在公司的Architecture Day上会有进一步的更新,因为它也需要试图赶上竞争对手。
-
处理器
+关注
关注
68文章
19138浏览量
228983 -
英特尔
+关注
关注
60文章
9875浏览量
171383 -
cpu
+关注
关注
68文章
10816浏览量
210997
原文标题:英特尔的7nm处理器被推迟 至少要到2022年才能到货
文章出处:【微信号:IEEE_China,微信公众号:IEEE电气电子工程师】欢迎添加关注!文章转载请注明出处。
发布评论请先 登录
相关推荐
评论